Active Directory configuration involves different actions. Each action has a timeout period. If the action is not complete within the timeout period, it is marked as failed.
Action | Timeout period | Interval between each stage |
|---|---|---|
Client system migration from ePO - On-prem to ePO - SaaS. | 90 min | 30 sec |
Trellix Agent upgrade | 5 hrs | 4 min |
Trellix DXL deployment/upgrade | 30 min | 30 sec |
Trellix DXL connectivity | 30 min | 5 sec |
Active Directory configuration deployment | 60 min | 5 min |
Test Connection | 30 times | 1 min |