Active Directory configuration migration actions and intervals

Prev Next

Active Directory configuration involves different actions. Each action has a timeout period. If the action is not complete within the timeout period, it is marked as failed.

Action

Timeout period

Interval between each stage

Client system migration from ePO - On-prem to ePO - SaaS.

90 min

30 sec

Trellix Agent upgrade

5 hrs

4 min

DXL deployment/upgrade

30 min

30 sec

DXL connectivity

30 min

5 sec

Active Directory configuration deployment

60 min

5 min

Test Connection

30 times

1 min