The new docs.trellix.com offers a modernized UI and AI-powered features like conversational searches. Content is currently available only in English. Other languages will be available in mid-October 2026. We hope you enjoy the new experience.

Using Trellix ePO - On-Prem 5.10.x or 5.9.x

Prev Next

You can use a deployment task in Trellix ePO - On-prem 5.10.x or 5.9.x 5.10.x or 5.9.x to upgrade to Trellix ENS 26.x on your endpoints. You can upgrade from version 10.2.x, 10.5.x, or 10.6.x.

Deployment tasks can be set up as continuous (for endpoints in specific groups or with specific tags) or fixed (for a static set of endpoints).

Note

For the Intel architectures, you can directly upgrade to version 26.x from version 10.7.0 (November 2022) or later. For the ARM architectures, the upgrades are not supported and upgrade section is not applicable, refer 000014791 for details.

Note

The Endpoint Migration Assistant supports Trellix ENS version 10.7.18 as the final supported version for migrating legacy settings. This version limitation applies to all migration workflows.

  1. Before the installation:

    Note

    The installer now automatically detects missing Root or Intermediate certificates on the endpoint before proceeding. This check prevents installation failures caused by incomplete certificate chains.

  2. Upgrade product extensions and installation packages on Trellix ePO - On-prem.

  3. Update content files on Trellix ePO - On-prem.

  4. Deploy product software to endpoints.

  5. After the installation: