Scenario 1: Deployment of standalone Trellix DLP 8800 Appliance

Prev Next

Caution

Read this guide for the step-by-step instructions before setting up the hardware. Don't connect to the power sources until the hardware installation is complete as both the appliance and Trellix DLP Capture Storage Array are set to ON by default when the power sources are connected. Also, don't turn on the Trellix DLP Capture Storage Array until the appliance is set up.

  1. Before you start to set up the hardware, read these topics:

    • FCC compliance

    • Safety compliance guidelines.

    • Rack-mounting considerations

    • Check your shipment

  2. Prepare the Trellix DLP 8800 appliance.

  3. Connect a monitor, keyboard, and mouse to the appliance. Connect the appliance.

  4. Connect the appliance power cords. The appliance ships with two AC power cords specific to your country or region. Turn on the appliance.

  5. Reinstall the appliance software when you connect a capture storage disk to an existing appliance.